All services of the cost estimation module 4cost-aces:
  • Calculate Development and manufacturing costs (HW + SW) swiftly at an early stage
  • Value analysis (design-to-cost)
  • Project management
  • Purchasing department
  • Sales
  • Development (R&D)
  • Marketing
  • Management
  • Fast and accurate cost estimates based on mathematical dependencies
  • No Data Base needed
  • Measurably les effort compared to detailed calculation
  • Few information required
  • Fast variant, scenarios considerations (countries, production quantities, technologies, etc.)
  • Provides technology-neutral benchmark data (Greenfield AND Brownfield)
Areas of use
  • Calculate Development and manufacturing costs (HW + SW) swiftly at an early stage
  • Value analysis (design-to-cost)
  • Project management
  • Purchasing department
  • Sales
  • Development (R&D)
  • Marketing
  • Management
Key features
  • Fast and accurate cost estimates based on mathematical dependencies
  • No Data Base needed
  • Measurably les effort compared to detailed calculation
  • Few information required
  • Fast variant, scenarios considerations (countries, production quantities, technologies, etc.)
  • Provides technology-neutral benchmark data (Greenfield AND Brownfield)

RECOGNIZE COSTS EARLY

Your project starts. You are ready. But are you also prepared at a cost that lurks secretly and invisibly? With our cost estimate module 4cost-aces, you can identify possible cost dangers already in the concept phase and navigate past by them very safely.

Manage with vision

4cost-aces evaluates electronic and mechanical assemblies as well as software. Technical and business scenarios are presented in a swift and you can with a maximum accuracy calculate:

  • Manufacturing cost
  • Software design and development cost
  • Hardware development cost
  • The cost of Prototypes
  • Simulate LifeCyclecost (LCC) scenarios
  • And define the Total Cost of Ownership (TCO)

Through this early-available precision, your management gets valid information on the feasibility of projects and subprojects. This is the only way to reliably evaluate investment decisions.


The superior concept

In practice, early cost estimates are often suboptimal. For example, Expert surveys are conducted. This provides fast but hardly reliable results.

4cost-aces, on the other hand, is based on many different cost estimation relations (CER’s). This interrelationship of technical parameters from industries and economic sectors have been collected and analysed for years, and then implemented into the Model.

Ergo represents 4cost-aces exclusively the common processes and procedures. The system works with mathematical algorithms in a parametric costing model.